UPGRADE OF ELECTRICAL SWITCHGEAR AT HARLOW CENTRAL FIRE STATION AND NWGSDP
The objective of the works was to standardise the distribution switchgear utilise within the Fire Station and to upgrade, in most instances, the protection of final circuits which included the earth fault protection.
As Raytell was working within a 24hr emergency facility, we ensured that power was available at all times, we provided a generator to ensure there was no disruption to power.