The works consisted of the installation of a new main MCCB panel to serve the school.
- The installation of a 200 x 100 2 compartment white powder coated trunking throughout the two levels of the school for future wiring distribution expansion.
- The installation of various distribution boards throughout the school and their respective supply circuit cabling.
- The installation of new main and emergency LED lighting including controls within the ground and first floor halls.
- All main earthing and bonding.